 Solar Project Registration & SEC Process in Saudi Arabia

This guide outlines the key steps for registering solar panel projects and navigating the Saudi Electricity Company (SEC) grid connection process in the Kingdom of Saudi Arabia (KSA).

1. SEC’s Role

The SEC is the state-owned utility managing the National Grid. Its primary role for solar panel projects is to approve and manage their safe integration into the grid.

2. Project Classification

Small-Scale: ≤ 500kW capacity (e.g., rooftop solar panel systems). Governed by REPDO and ECRA. SEC handles grid connection.

Large-Scale: > 500kW capacity (e.g., utility-scale solar panel farms). Led by REPDO and the Saudi Power Procurement Company (SPPC), with SEC providing grid access.

3. Core Registration Steps

Preparation: Finalize the solar panel system plan. Register the project with REPDO.

Compliance: Ensure all solar panels hold mandatory SASO 2874 certification. Submit technical designs to ECRA for grid compliance approval.

4. SEC Connection Pathway

For Small-Scale Solar Panel Projects:

Apply via the Shams platform or SEC portal with required documents.

Pay the SEC application fee (in SAR).

Undergo SEC technical review and site inspection for the solar panel installation.

Sign a Grid Connection Agreement with the SEC.

After installation, obtain SEC inspection approval and the Grid Connection Certificate.

For Large-Scale Solar Panel Projects:

Win a bid through SPPC and sign a long-term PPA.

Submit a comprehensive Grid Access Study for the solar panel plant to the SEC.

Sign a tripartite agreement (SPPC/SEC/Developer).

Obtain SEC construction permits before building the solar panel array.

Secure the Commercial Operation Date certificate from SEC after final testing.

5. Key Notes for KSA

SASO 2874 for solar panels is non-negotiable.

Use the digital Shams portal for faster small-project processing.

Maintain proactive communication with the SEC and SPPC (for large projects).

Align projects with Saudi Arabia’s Vision 2030 renewable energy goals.

Conclusion

Successful solar panel project implementation in Saudi Arabia requires strict adherence to the REPDO registration, SASO certification, and SEC grid connection procedures. Understanding this pathway is essential for developers.